5/19 MAX disruption
MAX Light Rail was shut down through downtown and on the Yellow Line on May 19 after a mistake was made in lifting the Steel Bridge, damaging trains and the overhead wires (55 photos)
Photos per page: Photo size:
Page 1 of 3: Previous Page | Next Page
| Traffic being diverted off Steel Bridge |
![]() |
| View on flickr / original size |
| The stalled train |
![]() |
| View on flickr / original size |
| Traffic being directed off Steel Bridge |
![]() |
| View on flickr / original size |
| 0519081155b |
![]() |
| View on flickr / original size |
| TriMet Maintenance van |
![]() |
| View on flickr / original size |
| Lots of white shirts |
![]() |
| View on flickr / original size |
| MAX operators walking on the bridge |
![]() |
| View on flickr / original size |
| 0519081157b |
![]() |
| View on flickr / original size |
| 0519081158a |
![]() |
| View on flickr / original size |
| Two stalled trains on Steel Bridge |
![]() |
| View on flickr / original size |
| TriMet van |
![]() |
| View on flickr / original size |
| 0519081200b |
![]() |
| View on flickr / original size |
| Steel Bridge ramp blocked |
![]() |
| View on flickr / original size |
| Not in Service Yellow Line train |
![]() |
| View on flickr / original size |
| Rose Quarter Transit Center |
![]() |
| View on flickr / original size |
| Rose Quarter Transit Center |
![]() |
| View on flickr / original size |
| Waiting to board shuttle buses |
![]() |
| View on flickr / original size |
| Waiting to board shuttle buses |
![]() |
| View on flickr / original size |
| Full shuttle bus |
![]() |
| View on flickr / original size |
| Waiting to board shuttle buses |
![]() |
| View on flickr / original size |
Page 1 of 3: Previous Page | Next Page
Leave a Reply
Sorry, comments are not currently being accepted.




















