Portland Mall 2008
Construction on 5th and 6th Avenues (195 photos)
Photos per page: Photo size:
Page 2 of 10: Previous Page | Next Page
No (un)loading at Greyhound |
View on flickr / original size |
New curb ramp |
View on flickr / original size |
NW 6th and Irving track curve |
View on flickr / original size |
NW 6th and Irving track curve |
View on flickr / original size |
NW Irving track setback |
View on flickr / original size |
Signal building renovation |
View on flickr / original size |
Old North Terminal |
View on flickr / original size |
Old North Terminal |
View on flickr / original size |
Old North Terminal |
View on flickr / original size |
Curbs for sidewalk end |
View on flickr / original size |
Old North Terminal looking east |
View on flickr / original size |
Old North Terminal break building |
View on flickr / original size |
Signal building renovation |
View on flickr / original size |
Old Greyhound bus exit |
View on flickr / original size |
New Portland Mall signal |
View on flickr / original size |
New Portland Mall signal |
View on flickr / original size |
Benson Bubbler |
View on flickr / original size |
U.S. Bancorp potted plants |
View on flickr / original size |
Fallen candlesticks |
View on flickr / original size |
Bus stop relocation sign |
View on flickr / original size |
Page 2 of 10: Previous Page | Next Page